Episodes
Wednesday Jun 24, 2020
Talking future projects, and London Power Tunnels with Gareth Burden from National Grid
Wednesday Jun 24, 2020
Wednesday Jun 24, 2020
In this edition of The Engineers Collective, the New Civil Engineer team talk about all things future-projects, including the impact of our change in travel habits and the possibility of an HS2 extension to Scotland.
Later, they are joined by the National Grid’s project director for London Power Tunnels 2, Gareth Burden. Gareth addresses the ramping up of a major infrastructure project in the middle of a pandemic, and helps us understand the massive scale and complexity of the full London Power Tunnels project. The conversation is framed in the context of coronavirus, of course, and the changing levels of power consumption and demand as a result.
The Engineers Collective is powered by Bentley Systems. Around the world, engineers and architects, constructors and owner-operators are using Bentley’s software solutions to accelerate project delivery and improve asset performance for transportation infrastructure that sustains our economy and our environment. Together, we are advancing infrastructure.
Find out more at www.bentley.com
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.